Asra’s Mt Stirling Project consists of 160km2 of highly prospective gold, critical minerals and rare earths on a 30km-long strike length.

Asra Minerals increased its tenement package in 2022 to include the Tarmoola Pastoral Station which fits within Asra’s growth development strategy and landholding position in the Leonora region.

Asra also upgraded its Mineral Resource estimate by 23%, taking the resources from 118,384oz to 152,000oz @1.7g/t Au at Viserion and Stirling Well deposits in 2022.

The Company completed over 5,000m of drilling in 2022 and plans for exploration in 2023 aims to unlock the potential size of its gold resource and exploration upside at its 10 major gold targets including Diorite/ Estera and Little Wonder prospects.

Metallurgical characterisation studies and resource drilling will also be explored to expand its critical minerals and clean heavy rare earths footprint at Mt Stirling which currently stands at around 3.6km.

The REE mineralisation at Yttria and Wishbone are near surface and dominant in the high-value, heavy portion of rare earth elements.

Gold Resource
152 Koz Au
Ms Viserion
  • 26 Koz Indicated (391,000t at 2.1g/t Au)

  • 111 Koz Inferred (2.15Mt at 1.6g/t Au)

Stirling Well
  • 15 Koz Inferred (198,000t at 2.3g/t Au)^